LiftioDownload

Track your lifts.

A minimalist gym tracker. Dark, fast, offline-first.

Download on the App Store

Available on iPhone. £1.99/month, first month free.

Liftio home screen showing overview stats, calendar heatmap, and recent workouts

No ads. No tracking.

No IDFA · no analytics

Works offline.

Syncs across your devices

One developer.

MGKCodes Ltd

What is new

Everything you need.
Nothing you do not.

New

Your training, narrated.

A short read on your week, on the home screen. Sessions, frequency, trending lifts, weight changes — written for you, not for the algorithm.

  • Refreshes once a day
  • Anonymised stats only — name and email never leave your device
  • No coaching, no congratulating
Liftio home screen showing daily training summary

Active workout

Log every set.

Auto-filled previous data. PB detection. Per-set checkmarks. The screen stays out of the way while you train.

  • Tap to confirm a completed set
  • Personal-best rows highlight on the spot
  • Drag to reorder mid-workout
Active workout screen with sets logged for Barbell Bench Press

New

Curated splits. One tap to add.

PPL, Upper / Lower, Arnold, Full Body, Body Part, Power-Hypertrophy. Pre-built routines you can drop into your week and edit.

Add a workout sheet showing curated split templates

Exercise detail

Every session, recorded.

Top set, volume PR, estimated 1RM. A chart of weight, volume, reps, or sets across 30 days, 90 days, or all time.

  • Last-session breakdown at a glance
  • Tap any session to see the full set log
  • Estimated 1RM updates as you lift
Barbell Bench Press exercise detail with last session, top set, volume PR, and progress chart

New

Form cues for every lift.

Front and back muscle diagrams, start and end positions, and a one-line technique note. Built in, not behind a paywall.

Barbell Bench Press form sheet with muscle diagram and technique illustration

Pricing

£1.99 a month.

Same app, same features, same data on either plan.

Monthly

£1.99/month

First month free.

Then £1.99/month, cancel anytime.

Annual

£19.99/year

Save £3.89.

Works out at £1.67/month.

Download Liftio

Choose your plan inside the app. Subscription managed by Apple.

Lifters

Trusted by lifters.
Loved by minimalists.

Finally a gym app that does not try to be a social network. I open it, log my sets, and close it.

Alex M.

Powerlifter

The daily summary is the first stat screen I have actually read twice. It just tells me what happened — no congratulations, no trophies.

Sarah K.

CrossFit

Switched from Strong after three years. Liftio is faster, cleaner, and the progress charts are excellent.

James R.

Bodybuilder

Get started

Start tracking today.

£1.99/month. First month free. Cancel anytime in Apple Subscriptions.

Download Liftio

Available on iPhone.

LiftioDownload